Commercial and utility-scale solar projects are designed to generate electricity for decades. During that time, equipment manufacturers, software systems, service providers, regulations, and operating requirements may change significantly.
When developers select inverters, plant controllers, monitoring systems, or battery energy storage equipment, they are making decisions that can affect the long-term operation of the asset.
Those decisions increasingly involve cybersecurity and digital control.
In Episode 64 of The Solar Coaster Podcast, Anna Covert and Alex Herrera explore the relationship between solar procurement, connected equipment, cybersecurity, and project bankability.
The central question is straightforward: how can developers protect their ability to operate, maintain, and adapt a renewable energy project over its entire life?
Why Cybersecurity Matters in Modern Solar Facilities
Solar power plants are no longer collections of isolated electrical equipment. Modern installations use interconnected technologies to monitor production, control equipment, coordinate grid interactions, and support maintenance activities.
Inverters may communicate with plant controllers, monitoring platforms, and remote service teams. Battery energy storage systems add additional layers of communications, software, and power conversion equipment.
These technologies help operators understand system performance and respond to problems.
However, connected equipment also creates questions about access permissions, update procedures, data ownership, vendor support, and operational continuity.
Developers should evaluate these questions as part of project design and equipment procurement, not simply as information technology concerns after construction is complete.
Remote Access to Inverters and Battery Storage Systems
Remote access can be valuable for diagnosing equipment faults, updating software, and helping maintain system availability.
Manufacturers and authorized service providers may need specialized access to perform certain tasks.
The challenge is ensuring those connections are properly governed.
Project owners should know who can access the equipment, what functions can be performed remotely, and how access is approved and revoked.
They should also understand whether they can independently verify access activity and maintain control over administrator credentials.
Remote access requirements should be defined in technical specifications and service agreements so that operational responsibilities are clear from the beginning.
Firmware Updates and Software Governance
Inverters, power conversion systems, battery controls, and monitoring platforms often depend on software that may require periodic updates.
Updates can be important for maintaining functionality and addressing known issues. However, changes to critical operating systems should follow documented approval and testing processes.
Developers should ask suppliers how updates are proposed, authorized, installed, verified, and recorded.
They should also determine whether the equipment relies on proprietary tools and whether the owner or an authorized third-party operator can use those tools.
These considerations are particularly important when equipment is expected to remain in service for many years.
Operational Data and Long-Term Asset Management
Solar installations produce operating data through inverters, meters, weather stations, monitoring systems, and other connected devices.
That information supports performance evaluation, troubleshooting, reporting, and maintenance.
Owners need a clear understanding of where the data is stored, who can access it, and whether it can be exported in usable formats.
Reliance on an external monitoring platform is not inherently problematic. Many owners benefit from specialized software and service providers.
However, access to important operating information should not become uncertain if the platform, service provider, or ownership structure changes.
Data portability and access rights should be addressed before procurement and included in relevant contractual arrangements.
What Happens When a Supplier Changes?
Solar projects may require equipment replacements, capacity expansions, or repowering during their operating lives.
If critical functions depend on one manufacturer’s proprietary system, changes can become complicated.
Replacing inverters may affect plant controller integration, communications, grid-code settings, testing, and utility coordination.
Adding a new battery energy storage system may require additional controls or communication interfaces.
These challenges do not necessarily make proprietary systems unsuitable. They do mean developers should understand the implications before committing to a particular architecture.
The flexibility to replace, repair, or expand equipment can have long-term economic value.
Interoperability and Independent Control Systems
Interoperability describes the ability of different equipment and software systems to work together.
For renewable energy owners managing several projects, interoperability can support equipment diversity and future changes.
An independent supervisory control and data acquisition system, commonly called SCADA, may provide a unified interface for multiple equipment types.
An independent plant power controller may also help coordinate assets without relying entirely on one equipment manufacturer’s control platform.
These architectures can help reduce certain dependencies, but they require appropriate cybersecurity, maintenance, configuration, and documentation.
Independent control systems are not a substitute for equipment-level security or compliance with applicable operating requirements.
Cybersecurity and Solar Project Bankability
Solar project financing depends on the expectation that an asset can operate reliably, fulfill contracts, meet grid obligations, and generate predictable revenue.
Cybersecurity becomes relevant to financing when digital dependencies could materially affect those outcomes.
For example, a project may face operational concerns if critical equipment cannot be serviced without access to a discontinued platform.
Similarly, limited access to performance data or uncertainty about control permissions may create challenges for operators and asset managers.
However, not every digital dependency makes a project unfinanceable. The impact depends on the specific equipment, contractual arrangements, technical architecture, and requirements of the financing parties.
The appropriate response is to identify material risks, document the controls in place, and establish practical requirements for suppliers.
Understanding Regulatory and Equipment-Origin Questions
Solar and storage developers must also navigate evolving regulations affecting connected equipment and clean energy sourcing.
The Solar Coaster episode discusses developments involving the Federal Communications Commission’s Covered List and rules concerning material assistance from prohibited foreign entities.
These developments can introduce procurement and documentation considerations, but cybersecurity, equipment origin, and eligibility under particular regulatory frameworks are separate issues.
A component’s country of origin does not automatically establish whether its software is secure.
Likewise, a general cybersecurity assessment does not necessarily determine eligibility under federal tax-credit or equipment authorization requirements.
Developers should identify the specific rules applicable to each project and seek appropriate technical and regulatory guidance before making final procurement decisions.
A Practical Procurement Checklist for Developers
Before selecting equipment for a commercial or utility-scale solar or storage project, developers can ask suppliers a series of practical questions.
Remote Access
- Who is authorized to connect to the equipment?
- How are permissions approved, monitored, and revoked?
- Who maintains administrator credentials?
- Can the owner verify remote-access activity?
Firmware and Software
- Who approves firmware updates?
- How are updates tested and documented?
- Which functions require proprietary software?
- What support is available if a product is discontinued?
Data and Monitoring
- Where is operating data stored?
- Who can access it?
- Can it be exported in a useful format?
- What happens if the supplier’s cloud services are unavailable?
Interoperability and Expansion
- Can equipment from another manufacturer be integrated?
- Can the project accommodate future battery storage or repowering?
- What control-system changes would a replacement require?
- Which interfaces and capabilities must be verified at acceptance?
Compliance and Documentation
- Which regulatory requirements apply to the project?
- What evidence is required?
- What obligations will be included in the supplier agreement?
- How will compliance and operational controls be verified?
Answers to these questions can inform technical specifications, contractual obligations, commissioning requirements, and long-term operating plans.
Why Early Planning Is More Effective Than Late Corrections
One of the most important lessons from the episode is the value of addressing digital dependencies early.
Before equipment is purchased, developers may still be able to select alternative products, require particular access controls, establish data export rights, or design for interoperability.
Once construction is underway, changes can affect more equipment, more contractors, and more project documentation.
On an operating facility, replacing critical systems may involve engineering changes, integration testing, utility coordination, and additional approvals.
Early planning can therefore reduce the cost and complexity of addressing cybersecurity and digital-control issues later.
Building Long-Term Resilience Into Solar and Storage
Cybersecurity should not become an exercise in fear or a checklist completed without a clear purpose.
It should be incorporated into normal procurement discipline, alongside equipment reliability, warranty support, system performance, safety, and long-term operating requirements.
The objective is not to eliminate every software dependency. That is unrealistic for modern connected infrastructure.
Instead, developers and asset owners should know which dependencies exist, understand their consequences, and reduce those that create unnecessary operational or commercial constraints.
Successful solar and storage projects need to remain adaptable as equipment, technology, service relationships, and regulations evolve.
Addressing these considerations during procurement can help protect the flexibility and performance of renewable energy assets for years to come.
Explore Solar Energy With Sun Energy Today
Understanding the technology and long-term operational requirements behind a solar project is an important part of making informed energy decisions.
Explore solar development opportunities and energy solutions through Sun Energy Today.
Get Started With Sun Energy Today
Listen to The Solar Coaster Podcast
Join Anna Covert and Alex Herrera in Episode 64 as they explore solar cybersecurity, battery storage, procurement risk, and long-term project bankability.
Visit The Solar Coaster Podcast
This educational article discusses operational and regulatory considerations described in the episode. Project-specific compliance and incentive eligibility require review of applicable requirements.
Podcast Transcript: Cyber Risk in Solar & Storage
The Solar Coaster Podcast, sponsored by Sun Energy Today. Featuring Alex Herrera and Anna Covert.
Alex Herrera: Here is my opening position: cyber risk in solar and storage is no longer something you park with the IT team after the plant is built. It is a procurement issue, and increasingly a bankability issue. When a project team chooses an inverter, a plant controller, a monitoring platform, or a battery power-conversion system, it is also choosing who can reach the asset remotely, who controls software updates, who holds administrator credentials, and where operating data goes. Those decisions can shape the project for twenty or thirty years. So if developers are still comparing equipment mainly on price, efficiency, warranty, delivery date, and grid-code compliance, they are missing a material part of the risk.
Anna Covert: I agree that the risk is real, but I think you are overstating the shift. Solar developers have always made procurement decisions under constraints. They already weigh technical performance, warranty strength, supplier reliability, and grid requirements. Adding cyber questionnaires and data ownership clauses sounds sensible, but calling it bankability can become a catch-all phrase. Lenders care whether the asset produces energy, meets contracts, and generates predictable cash flow. Cybersecurity could affect that, yes, but not every remote-access feature or cloud monitoring dependency is a financing crisis. We should be careful not to turn every software relationship into a red flag.
Alex Herrera: But that is exactly the point: it is not every software relationship. It is the ones nobody understands until too late. Modern inverters are not passive boxes converting DC to AC. They communicate with plant controllers, monitoring systems, and outside services. Many can be diagnosed, reconfigured, and updated remotely. The U.S. Department of Energy has long treated connected PV inverters and control devices as possible cyber entry points because changing their controls can have physical effects on the power system. If that is true, then remote access is not a side issue. It is part of the operating architecture of the power plant.
Anna Covert: Yes, but remote access also keeps plants running. If an inverter fault appears, a supplier may need to diagnose it quickly. If firmware needs updating, remote tools may reduce downtime. If grid-code parameters need adjustment, specialized tools and credentials may be necessary. The article's own logic admits these services are often useful and necessary. So the question is not whether remote access exists. The question is whether owners have visibility and control. I would argue that this is mainly a contract management issue: specify who can connect, what they can do, how approval works, and when access can be revoked.
Alex Herrera: Contract management is part of it, but not enough. A contract that says the owner can revoke access is weaker if, technically, the supplier still holds the only administrator credentials or proprietary tools needed to change critical inverter settings. A contract that promises data export is weaker if the operating data is trapped in a platform the owner cannot practically leave. A project may run for decades, while suppliers, software services, ownership structures, and regulations can change much faster. Procurement creates long-term dependencies, and some of the most important dependencies are not visible in the hardware spec sheet.
Anna Covert: Let me challenge that. Long-term dependencies are normal in infrastructure. Spare parts, warranties, maintenance agreements, and specialist service providers have always mattered. A turbine, transformer, inverter, or tracker can lock an owner into a certain support ecosystem. Why should software dependency suddenly be treated as more dangerous than ordinary vendor dependency? If a supplier withdraws support, that is a commercial risk. If a part becomes restricted, that is a compliance risk. If a firmware tool is proprietary, that is a technical support risk. These are not new categories; they are familiar risks with digital labels.
Alex Herrera: They are familiar risks, but the digital layer changes the speed and reach of the consequences. A physical spare part problem usually affects replacement timing. A control-system problem can affect operations, grid behavior, testing, utility coordination, and warranty support at once. If an inverter model has to be swapped before construction, that may mean an alternative model, a revised design, or a delivery delay. Later in development, the same swap can affect communications architecture, plant-controller integration, grid-code settings, and testing. On an operating site, it can mean extra engineering, integration testing, utility coordination, and possibly fresh approvals. That is not just a digital label.
Anna Covert: Fair, but we should separate cyber risk from regulatory exposure. The recent U.S. developments are important, yet they are not the same thing. The Federal Communications Commission added foreign-produced power inverters to its Covered List. Separately, new tax rules limit access to some clean-energy credits where qualified facilities, energy storage technologies, or eligible components receive material assistance from prohibited foreign entities. The Internal Revenue Service guidance uses PV modules, trackers, and inverters as examples for ground-mounted solar projects. But equipment origin alone does not prove whether a product is secure, and it does not automatically decide compliance under every rule.
Alex Herrera: I agree with that distinction, and it is crucial. Security, origin, and tax-credit eligibility are separate questions. A component's country of origin does not tell you whether the firmware is well managed, whether the remote-access process is controlled, or whether the project complies with a particular regulatory framework. But when multiple frameworks start pointing at equipment origin, connected devices, prohibited entities, and software control, the practical message to developers is the same: do not wait until commissioning. By then, the design may be locked, equipment ordered, grid studies completed, and the owner may already have accepted dependencies it cannot easily unwind.
Anna Covert: That is where I think the procurement discipline matters. Instead of making broad claims like cyber risk equals bankability risk, developers should ask specific questions. Who can connect to the inverter or power-conversion system? What permissions do they have? Can the owner monitor access and revoke it? Who controls firmware and administrator access? How are updates approved and installed? Which functions depend on proprietary original-equipment-manufacturer tools? What happens if the manufacturer withdraws support or the service contract changes? These are concrete, answerable questions. If the answers become technical requirements, contractual obligations, and acceptance criteria, the risk becomes manageable.
Alex Herrera: Manageable, yes, but only if those questions are asked early enough and with enough force. A supplier saying its equipment is secure or compliant is not adequate. The project has to define which requirements apply, what evidence is needed, and how that evidence will be checked. Otherwise, the developer may only discover after commissioning that the owner cannot export performance data in a usable format, cannot approve firmware updates through a clear process, cannot see who accessed the plant, or cannot replace a supplier without redesigning part of the control architecture. Those are not minor inconveniences for an asset expected to earn money for decades.
Anna Covert: Let's talk about data, because that is often treated as abstract. Inverters, meters, weather stations, and monitoring systems produce large amounts of operating and performance data. Owners should know where that data is stored, who can see it, and whether it can be exported. I agree. But I also think there is a temptation to say owners must control everything directly. That can be unrealistic. Smaller owners or lean operating teams may rely on supplier platforms because they do not want to build internal systems. The better goal is not total self-sufficiency. It is clarity: what data is needed, who has access, and what happens if platforms change.
Alex Herrera: Clarity is the beginning, not the endpoint. Consider interoperability. A utility-scale PV plant might have hundreds of inverters coordinated by a plant power controller. If the inverter supplier changes later, can replacement equipment be integrated without redesigning the whole control system? On a hybrid solar-plus-storage site, can a new battery or power-conversion system be added without tying the plant more tightly to another proprietary platform? If the answer is no, the owner has less freedom to repower, extend, repair, or adapt the site. Since very few solar assets stay in their original configuration for thirty years, that lack of flexibility has real economic value.
Anna Covert: But independence is not magic. An independent supervisory control and data acquisition system may provide a single view across different inverter fleets and equipment. An independent plant power controller may coordinate assets at plant level instead of tying the broader architecture to each manufacturer's platform. That sounds attractive, especially for mixed portfolios. Yet independent layers also have to be secured, maintained, and configured properly. They do not remove vulnerabilities in the underlying inverters or batteries. They do not replace equipment-level cybersecurity. They do not automatically guarantee grid compliance or regulatory compliance. So we should not pretend independent architecture solves the whole problem.
Alex Herrera: I am not pretending that. In fact, the limits make the procurement argument stronger. The point is to reduce dependencies, not simply move them from one supplier to another. An independent control layer can give owners more room to maneuver as equipment is added, service providers change, or operating needs shift. But it still needs proper cybersecurity, maintenance, configuration, and documentation. Similarly, independent assurance can review system architecture, access arrangements, software dependencies, supplier risks, and regulatory readiness within an agreed scope. But a cybersecurity review does not automatically establish compliance with FCC rules or separate foreign-entity requirements. The value is in exposing dependencies before they become constraints.
Anna Covert: That is a reasonable version of the argument. My concern is about overreaction. If every lender begins demanding exhaustive cyber evidence for every component, projects could slow down, costs could rise, and procurement could become another bottleneck. Solar and storage already face delivery schedules, grid interconnection issues, policy uncertainty, and cost pressure. If cyber review becomes vague, duplicative, or inconsistent, it could create friction without improving resilience. The industry needs practical standards in procurement documents, not open-ended fear. Developers need to know which evidence is enough, which risks are material, and which risks are simply inherent in operating modern connected equipment.
Alex Herrera: I would answer that vague review is exactly what we should avoid. The practical route is to make cyber and software dependency part of normal procurement, not a late-stage emergency. Ask for remote-access architecture. Ask for credential-management procedures. Ask who approves firmware updates. Ask what functions require proprietary tools. Ask where data is stored and whether it can be exported. Ask how the equipment integrates with independent SCADA or plant power control. Ask what continues to work locally if an original-equipment manufacturer's cloud service goes down. These questions are not exotic. They are the digital equivalent of checking warranties, spare parts, and performance guarantees.
Anna Covert: Then let me push on bankability again. Lenders and investors evaluate whether a project can stay available, meet contractual and grid obligations, and produce predictable cash flow. If vague remote-access arrangements or heavy reliance on one supplier threaten those outcomes, they become relevant. I accept that. But cyber risk does not decide bankability on its own, and financing requirements vary between lenders and projects. We should not imply that a project with a supplier cloud dependency is automatically unfinanceable. The better statement is narrower: digital dependency is getting harder to separate from the risks lenders already evaluate.
Alex Herrera: That narrower statement is exactly where the market seems to be heading. No one is saying one cloud platform kills a project. The issue is whether the owner understands the dependency and can manage it. Can access be approved, monitored, and revoked? Can the plant keep operating if a remote service is unavailable? Can firmware be updated in a controlled way? Can a supplier be replaced without disrupting the rest of the plant? Can the project document the answers for financiers, owners, and operators? If not, the lender may reasonably ask whether a technical dependency could become a cash-flow problem.
Anna Covert: And the new rules increase the need for that documentation. For projects relying on clean-energy tax credits, sourcing can carry direct financial consequences. Restrictions on connected equipment can also raise technical questions before procurement or financing is locked in. Still, a regulatory change does not automatically make installed equipment unusable. The applicable rules, the component's role, and the technical risks all need assessment. That nuance matters. Otherwise, owners might panic about equipment that is not actually affected, or they might spend money replacing hardware when the real issue is access control, documentation, or contract terms.
Alex Herrera: Nuance matters, but waiting is expensive. A dependency that is comparatively easy to handle while suppliers are still being chosen can become expensive once the plant is built. If the project team identifies risk early, it can choose a different inverter, require different access controls, insist on data export rights, design for interoperability, or build acceptance tests around those requirements. If the team waits, every change touches more systems and more stakeholders. That is why I keep returning to procurement. Procurement is the moment when the project still has options. Commissioning is often the moment when the project discovers what it already agreed to.
Anna Covert: So maybe the disagreement is less about whether the issue matters and more about how to frame it. I resist alarmist language because cyber can become a buzzword. But I agree that procurement teams should treat equipment as part of a long-term operating system, not just a collection of boxes. The inverter converts DC to AC, but it also participates in communications, controls, monitoring, updates, and sometimes remote service. Batteries and hybrid systems add more layers. If those layers are opaque, the owner may inherit operational constraints that were not priced into the original purchase decision.
Alex Herrera: Exactly. The industry has become very good at comparing modules and inverters on price, efficiency, warranties, availability, and delivery. Those criteria still matter. The argument is not to replace them. It is to add maintainability, supportability, adaptability, data control, access control, and regulatory exposure to the decision. Equipment must not only meet today's specification; it must remain manageable as firmware changes, components fail, sites are repowered, service providers change, and regulations evolve. A system that looks attractive on purchase day but cannot adapt tomorrow may carry costs nobody saw when the order was signed.
Anna Covert: Let's make this concrete for a developer listening now. Before signing, ask suppliers to map remote access: who connects, through what process, with what permissions, and with what logs. Ask how administrator credentials are created, stored, transferred, and revoked. Ask how firmware updates are proposed, approved, tested, installed, and documented. Ask which functions require proprietary tools and whether the owner or a third-party operator can use them. Ask where operating data lives, who can view it, and whether it can be exported in a usable format. Ask whether the plant can operate locally if external services are unavailable.
Alex Herrera: And add the portfolio view. If you operate multiple projects built at different times with equipment from several manufacturers, a common control layer may reduce reliance on separate proprietary systems. If you plan to pair PV with battery storage, make sure adding a new battery or power-conversion system does not lock the entire plant into another closed platform. If replacement equipment might be needed later, ask whether it can be integrated without redesigning the whole control system. These questions belong in technical specifications, contract obligations, and acceptance criteria, not in a spreadsheet someone creates after commissioning.
Anna Covert: I would also remind listeners that evidence matters. A supplier's general statement that equipment is secure or compliant should not be the end of the conversation. But evidence should be tied to defined requirements. What exactly are you trying to prove? Remote access control? Firmware governance? Data portability? Interoperability? Regulatory readiness? Each has a different kind of evidence. If developers ask vague questions, they will get vague answers. If they define requirements clearly, suppliers can respond clearly, and financiers can evaluate the residual risk more confidently.
Alex Herrera: That is the constructive path. Cyber risk should not become theater. It should become procurement discipline. The goal is not to eliminate every dependency; that is impossible in modern solar and storage. The goal is to know which dependencies exist, decide which are acceptable, reduce the ones that create avoidable lock-in, and document the rest. Owners need plants that can keep running, adapting, and earning returns over decades. Lenders need confidence that digital dependencies will not undermine availability, contractual performance, or grid obligations. Developers need to preserve options before the design hardens.
Anna Covert: Then my closing view is this: cyber risk is not automatically a bankability crisis, but it is becoming part of the bankability conversation when it affects availability, compliance, serviceability, or cash flow. The smart response is not panic and not box-checking. It is early questioning, better contracts, clearer technical requirements, and realistic architecture choices. Remote access, software support, and data platforms are useful, but they need governance. Independent control layers can help, but they are not a cure-all. Regulatory questions must be assessed carefully, because origin, security, and eligibility are related but not identical.
Alex Herrera: And my closing view is sharper: procurement decisions are resilience decisions. When developers buy inverters, controls, monitoring systems, and storage equipment, they are buying decades of software relationships, access rights, data flows, service dependencies, and change-management constraints. Those choices can be cheap to adjust before purchase and expensive to unwind after construction. So cyber risk becomes a procurement question before it becomes a cybersecurity problem. The winners will not be the teams that ask whether a device is simply secure. They will be the teams that ask who controls it, who can change it, who can replace it, and how the plant keeps earning when technology, suppliers, and rules change around it.
End of the dialogue visible in the supplied episode screenshots.
Learn More About Solar Energy With Sun Energy Today
Discover Sun Energy Today and explore renewable energy development opportunities.
Get Started With Sun Energy Today
Listen to The Solar Coaster Podcast
Listen to Anna Covert and Alex Herrera discuss renewable energy technology, solar project economics, procurement, and the challenges shaping the industry.